Tuesday, 11 December 2012

012-12-11 work

shelves, Eamonn getting shocked (static), Ultima power cables loose, ordered scroll pumps

2012-12-11 work names

J: Pikey Carrie
T: Creepy Leigh, Stan, Professor My Bad

Monday, 10 December 2012

2012-12-10 work

8 assess and restart Ultima (compressed air out after substation failure this weekend

Weston and Georg want bits to do mixed flow in capillaries

bad signal on the Ultima

ordered scroll pumps

chat about Windows server with justin

harvested the shelving for back closets

reseated fibre optics on LCT

430

Wednesday, 5 December 2012

2012-12-05 work

Sorted the last of the pre-install for Q-Exactive

cloned Kate's HDD then back-cloned it to another HDD that wouldn't freeze


Tuesday, 4 December 2012

2012-12-04 Tuesdaywork notes

2012-12-04 Tuesday work notes

Danny MSSS engineer in for Q2B quad repair.

Kate's PC still fucked up, running some final Drive diagnostics before imaging the fucker and replacing it (hoping for the best).

Finished the frankenstein pc (one from three dead ones)

Ordered bench for the Q-Exactive

Talked at length with Kevin the Sparky about options for moving the ultracentrifuge, but longer cable uses thicker conductor, etc.  Consensus is wait it out.

Loosened the front seals on the Akta Prime FPLC and tested flow.  Seemed fine, but sure the users will botch things up.

Cherine has a jogging club sweatshirt, for what that's worth.